Firgas container for the LNG Hybrid Barge reaches the Port of Hamburg
Time:2015-01-06
Browse:101
As part of the LNG Hybrid Barge’s testing programme, the first gas container for the marine fuel was delivered on Monday. “The testing of the gas engines at the Port of Hamburg is a first for both the classification society and participating authorities”, said Dirk Lehmann and Henning Kuhlmann, both Managing Directors of the global market leader for high-performance rudders.
The gas container from Shell Ganor, represented by Mr. Aksel Skjervheim, Marine LNG Business Development Manager, was formally delivered to Becker Marine Systems at the Blohm + Voss shipyard. The container with the marine fuel had previously made the journey from the Fluxys LNG Terminal in Zeebrugge, Belgium to Hamburg.
The barge works like a floating power plant and uses low-emission LNG (Liquefied Natural Gas) to supply environmentally-friendly energy to cruise ships. Compared to conventional marine diesel with 0.1% sulphur content, sulphur dioxides and soot are no longer emitted. Emissions of nitrogen oxides and carbon dioxide are also significantly reduced.
The LNG Hybrid Barge, developed by Becker Marine Systems and recently christened theHUMMEL (bumblebee), will officially commence operations at the Port of Hamburg at the beginning of the cruise season in spring 2015.